Go Back
To The West In Air-Conditioned Comfort. Trans-Australian Railway
c1951. Colour process lithograph, 100.6 x 62.9cm. Repaired tears, creases and old folds. Linen-backed. Text continues “Fast diesel electric trains.” Held in NLA. Diesel electric trains (GM1) commenced operations on the Trans-Australian Railway on 23 Sept., 1951. They were built between 1951 and 1967 by Clyde Engineering in Granville, NSW for the Commonwealth Railways. Ref: Wiki.
Item #CL182-98
Please contact us re availability other currencies
See all items in
Posters